How to Choose a Machinery Mover

The questions that separate a rigging professional from a truck with a winch: insurance, lift plans, permits, equipment.

Every plant manager who has moved a machine has a story about the cheap quote. The truck arrives, the load goes on, and somewhere between the loading dock and the new pad the schedule, the machine or the floor pays the difference back.

Machinery moving looks like trucking until something goes wrong. It is not. It is a planned lift, a load secured to a standard, a route somebody pulled permits for, and a machine set down on the mark and aligned. Four questions tell you which of the two you are buying.

What You Are Actually Buying

A machinery mover is not selling you a truck. They are selling you the plan that gets a machine off that truck, through your building and onto its pad without hurting anyone, breaking anything or costing you a shift. The equipment matters, but it is the last thing to ask about, not the first.

The Four Questions to Ask

  1. What insurance do you carry, and how fast can I have the certificate? Ask for the numbers, not the word insured.
  2. Will I see a lift plan before the crew arrives? A load weight, a centre of gravity, a path of travel and a floor capacity, written down.
  3. Who pulls the permits and books the escorts? On an oversized or overweight load somebody has to, and it should not be you.
  4. What equipment do you own, and what are you renting? Owned gear means the lift is scheduled around your plant instead of around a rental yard.

None of these are trick questions. A contractor who does this work every week answers all four on the phone, without going away to check.

A ReadyForce crew on a commercial site

What a Straight Answer Sounds Like

On Insurance

CVOR active, WSIB in good standing, cargo insurance to $1MM standard with riders above it, and commercial general liability of $5MM aggregate and $2MM per occurrence under an $8MM umbrella. A certificate of insurance to your site in about an hour, not next week.

On the Lift Plan

Load weight and centre of gravity calculated. The path of travel walked, with door heights, floor capacity and every turn measured. Rigging hardware inspected and tagged, exclusion zones marked and spotters briefed. Nothing leaves the ground before that exists on paper.

Signs to Keep Looking

Most of the trouble on a machinery move is visible in the quote. These are the ones worth stopping on.

  • A price before anyone has seen the machine or walked the site
  • Fully insured with no certificate and no numbers behind it
  • No lift plan, or a lift plan written after the truck was booked
  • Permits and escorts described as your responsibility
  • Rigging hardware with no inspection tags on it
  • The alignment quoted separately, by somebody else

The Handoff Is Where Jobs Fail

Machinery moves are often quoted by one company, rigged by a second and aligned by a third. Every handoff is a place for a date to slip and for accountability to go missing, and it is usually the last one that hurts, because a machine placed to the inch is still a machine that will not run.

So ask the last question first: is the crew that places the machine the crew that levels, anchors and aligns it? When rigging, transport and millwright work sit under one project manager, there is one number to call and one company answerable for the date.