For Estimators, Engineers & RFPs
Specify ReadyForce
Everything you need to put ReadyForce in a tender, a spec or a vendor file: capability statement, certifications, insurance and WSIB documentation, and an estimating team that answers.
- WSIB Clearance on Request
- TSSA Gas & Pressure
- CWB Welding
- Fully Insured
For Your Documents
What We Hand You, Before You Ask
Capability Statement
A one-page overview of fleet, capacities, certifications and track record, built to forward to whoever signs off.
Compliance Package
WSIB clearance, insurance certificates, TSSA registrations and trade licences, current and ready for your vendor file.
Scope Letters That Hold
Scoped before we price it. Your tender carries a real number, not a placeholder that grows on site.
References That Answer
Named references by division and industry, with permission, so your due diligence takes a day instead of a month.
The capability statement is a single PDF, ready to forward.Download the Capability Statement
Division Scope
Spec the Right Crew for the Section
Machinery Moving
Rigging, heavy haul, plant relocation. Gantries to 600 tons.
Industrial Millwrights
Install, laser alignment, commissioning, documented to spec.
Mechanical
Process piping, boilers, gas, steam and design-build. TSSA registered.
Overhead Doors & Docks
New construction packages, Division 8 coiling and sectional doors, dock equipment.
How to Reach Estimating
Tenders Get Answered, Not Queued
Send the Documents
Drawings, spec sections and the closing date, through the quote form or straight to estimating.
We Walk It or Call It
Site walk where the scope needs one, clarifying questions where it does not. Either way you hear from a person.
A Price You Can Stand Behind
Scoped before we price it. What we bid is what we build to.